• Double Room Evaporation Coating Machine,
  • Double Room Evaporation Coating Machine,
  • Double Room Evaporation Coating Machine,
  • Double Room Evaporation Coating Machine,
  • Double Room Evaporation Coating Machine,
  • Double Room Evaporation Coating Machine,

Double Room Evaporation Coating Machine,

Warranty: One Year
Type: Magnetron Sputtering Coating Production Line
Certification: CE, ISO
Structure: Vertical Horizontal
Control System: PLC
After-sales Service: Good
Customization:

Contact Supplier

Mr. Ji Jinhua
Marketing Director
Gold Member Since 2017

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company, Group Corporation

Basic Info.

Model NO.
NFI DECM 2000
Glass Washing Machine
According Your Requirement
Magnetron Sputtering Coati
According Your Requirement
Glass Leaching Paint Machine
According Your Requirement
Transport Package
Wood Packing Container Packing Safe Packing
Specification
according customer requirement
Trademark
NFI
Origin
China
HS Code
84649019
Production Capacity
3000 Sets/Year

Product Description


Double Room Evaporation Coating Machine Double Room Evaporation Coating Machine,


The quotation

Device name: NFI - 1220 Aluminum mirror product  Line
Quantity: 3 sets. Respectively: 
NFI  1220 double room evaporation coating machine,
NFI  1220.Spray paint machine,
NFI - 1220 glass cleaner
< a >  NFI - 1220 double chamber evaporative coating machine
A, technical parameters
1, workshop size: 2050 mm * 1400 mm * 1250 mm two rooms (length x width x height) x 2 room. 
2, the largest glass size: can be plated 1220 mm x 1830 mm per room six pieces of glass; thickness 1-10mm
Abstract: 3, extraction rate from the atmosphere to 5.0 x 10-2 is not more than 5 minutes (air pump) single room
4, equipment production: conservative calculate every piece of glass in 60 seconds, an hour: 66 pieces.
5, limit vacuum: 5 x 10-3 Pa (light, indoor cleaning)
6, installed power: 173.7 KW
7, cover an area of an area: 10 m x 8 m
8, the device performs GB/T - 11164-11164 national standards for vacuum coating equipment. 
Second, the main equipment configuration
1. The material
1.1 vacuum chamber with low carbon steel compound, strengthen the root for 12 gb beams.
1.2 vacuum suction pipe and valve and flange for low carbon steel, all through water nickel plating processing. 
1.3 artifacts for stainless steel frame
1.4 evaporation electrodes are brass rod copper sheet
2. The configuration list
 
The name of the   The number of Brand/origin
Plunger pump   2 Taiwan Sichuan nanguang vacuum equipment co., LTD
Roots pump   1 Taiwan
1 Taiwan
Sichuan nanguang vacuum equipment co., LTD
Rotary vane pump   1 Taiwan Sichuan nanguang vacuum equipment co., LTD
Diffusion pump   1 Taiwan NFI vacuum
Touch screen (color 7 inches)   1 Taiwan Taiwan wei lun
PLC    1 Taiwan Japan's mitsubishi
Regulating module   1 Set of Zhejiang hangzhou
Transformer   1 Set of Zhaoqing feida
Compound vacuum gauge   2 Taiwan Beijing tsinghua
Workpiece frame 3 Set of NFI-vacuum  
Control of electrical 1 batch Domestic famous brands  
Electric control cabinet 1 Set of NFI-vacuum  
             
Electrical control of PLC and touch screen control system, a high degree of automation, simple operation. Equipment manual, semi-automatic and fully automatic control can be realized, the evaporation parameters set up and adjust the touch screen, evaporation current smooth lifting.
[2].NFI - 1220 drench lacquer machine:
Specification: exterior size: (length x width x height) 16000 mm * 1400 mm * 800 mm, and most Chinese lacquer width: 1220 mm.
A, respectively made up by the following sections:
Head: 1, drenching lacquer is composed of fixed head, activities, its purpose is to form the lacquer screen, tighten the locking bolt between fixed head, live head, lacquer screen thickness can be adjusted, if we adjust the clearance adjusting screw of activity cephalic, shower curtain micro adjustment can be performed, and adjusted to drench lacquer head on both ends of the bearing nut, can change the lacquer screen height, the adjustment is very convenient.
2 coating conveying system: by spray paint, paint bucket, pump delivery pipe, filter, the flow adjusting valve and so on, its role is to provide work to drench and easy head coating, and recycling the residual coating, recycled.
3, drench lacquer, consists of two periods before and after each paragraph has a drive belt for carrying conveying artifacts, fast through spray painting lacquer screen, its transmission speed with frequency inverter speed control.
4, baking dry period: consist of infrared heating rods and fan and transmission system, air drying transmission speed is adjustable, workpiece heat 4 m first baking.By 6 m again after dry output, air drying is composed of 12 fan, the paint film coated work completed.(baked by 12 infrared heating heating, drying is made up of 12 fan)
5, electrical control system: the control button, indicator light, the governor, relays, inverter and other relevant electric components, control of the machine to operate
6, this product is equipped with two car frame frame used for glass and glass, easy to operate.
2, this product is the total power: 21.5 KW, respectively: drench lacquer is: power 3 KW, drying power is: 12 KW.Air drying power: 2 KW, transmission power: 3 KW, drench lacquer pump power: 1.1 KW.
 NFI- 1220 processor before plating

Specification: exterior size: (length x width x height) 5500 mm * 1400 mm * 800 mm, and maximum cleaning glass: 1220 mm.
A, this equipment is mainly composed of the following several parts:
1, vertical washing: consists of 17 xiaomao and diameter of 250 mm, generally used in pickling and polishing powder cleaning;
Article 2, plane wash: from 5 1400 mm x 140 mm flat wash, is used to clean water glass;
3, washing machine transmission system, the transmission speed with frequency inverter speed control;
4, sponge stick pressure water: consists of 6;
5, dry hot wind: by a centrifugal fan, a cutting wind knife;
6, electrical system according to the system: the control button, indicator light, inverter, relay, for electrical components such as operational control on the whole machine.,
7, water contact area with 304 stainless steel
2, this product is the total power: 21.5 KW, respectively: cold dry is: 7.5 KW, hot air dry power is: 9 KW.Transmission power: 3 KW.MAO sweeping power: 2 KW
[4], three device is responsible for the installation and one year free warranty, training operators and teach simple problem.
One, the method of payment
1.1: the first phase of the contract equipment total price 40% deposit; 
1.2 the second stage: the equipment before delivery to pay the total price 60%; 
Second, the date of delivery and acceptance
2.1 delivery time: 80 days (equipment deposit received); 
2.2 acceptance: equipment in supply and demand sides plant according to the list of the main parameters, equipment configuration and vacuum coating equipment standards for acceptance. 
Third, voluntarily.cannot configuration items
3.1 cooling water: 2 tons/hour, acuity 0.2 Mpa pressure; 
Compressed air: 3.2 3.2 m3 / min, 0.4-0.6 Mpa pressure;
3.3 power supply system: 380 v, 50 hz, three phase four wire, greater than 150 kva capacity; 
Four, technical training and after-sales service
4.1 requires the seller to send technicians abroad to installation and debugging, we will send debugging and training technical personnel, at the seller's technical personnel leave the seller's factory that day on calculation, the buyer should pay the service fee of the seller's technical personnel, every day to pay RMB: 100 USD/day.At the same time, the buyer will be responsible for the seller's technical personnel of the travel back and forth, the buyer will be responsible for the seller's personnel in buyer's factory for room and board, at the same time to ensure that the buyer's technical personnel in the buyer's factory in safety.
4.2 equipment factory, guarantees a year service;(foreign customers during the warranty period the seller is responsible for replacement or repair all parts quality problem does not charge any cost of raw materials) for the seller to send technicians abroad, produced by the round-trip travel and accommodation for buyer's account, charge 100USD/ day travel at the same time.At the same time to ensure the safety of the buyer's technical personnel in the buyer's factory.
Five, with random one set of parts, with one copy each of the use manual, electric diagram
 
Note: this offer is valid for 30 days.
Double Room Evaporation Coating Machine,
Double Room Evaporation Coating Machine,
Double Room Evaporation Coating Machine,
Double Room Evaporation Coating Machine,
Double Room Evaporation Coating Machine,

    
 
Contact Us
Ms.Cici
Marketing Director
 
Tel.:0086 25 52233485/0086 13770851561
 

Send your message to this supplier

*From:
*To:
avatar Mr. Ji Jinhua
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

People who viewed this also viewed